![]()
The following links will open the documents in PDF format.
MDOT ITS Pre-Deployment Study — Lansing Sector ITS Architecture Report
MDOT ITS Pre-Deployment Study — Lansing Sector ITS Architecture Report (full file ~ 9.6Mb)
MDOT ITS Pre-Deployment Study — Lansing Sector ITS Architecture Report (by section):
Title Page and Table of Contents (186 kb)
Executive Summary (1.1Mb)
Appendix A - Tier 1 Meeting Minutes (1.3Mb)
Appendix B - Tier 2 Meeting Minutes (294kb)
Appendix C - Communications Options (1.32Mb)
Appendix D - Stakeholder Inventory (153kb)
Appendix E - Turbo Inventory (2Mb)
Appendix F - Sample ITS Project Descriptions (251kb)
Appendix G - Proposed ITS Interconnects (3.16Mb)
This page last updated on
04/23/2007
by
Dan Dillinger
© 2007 Tri-County
Regional Planning Commission