The following links will open the documents in PDF format.

MDOT ITS Pre-Deployment Study Section 7 — Lansing Sector Summary Report
MDOT ITS Pre-Deployment Study – Lansing Sector (550 kb)

 

MDOT ITS Pre-Deployment Study — Lansing Sector ITS Architecture Report
(This document is a scanned image document and has a very large file size. For your convenience, the report is being
offered both as a single file (9.6 Mb) and as multiple file sections.)

MDOT ITS Pre-Deployment Study — Lansing Sector ITS Architecture Report (full file ~ 9.6Mb)

MDOT ITS Pre-Deployment Study — Lansing Sector ITS Architecture Report (by section):

Title Page and Table of Contents (186 kb)
Executive Summary (1.1Mb)
Appendix A - Tier 1 Meeting Minutes (1.3Mb)
Appendix B - Tier 2 Meeting Minutes (294kb)
Appendix C - Communications Options (1.32Mb)
Appendix D - Stakeholder Inventory (153kb)
Appendix E - Turbo Inventory (2Mb)
Appendix F - Sample ITS Project Descriptions (251kb)
Appendix G - Proposed ITS Interconnects (3.16Mb)

 

This page last updated on 04/23/2007 by Dan Dillinger© 2007 Tri-County Regional Planning Commission